“Optimization of Lead Time in Jewellery Manufacturing: Differentiation in Design and Model” (2024) Multidisciplinary Journal of Akseprin Indonesia, 2(2), pp. 38–46. Available at: https://jurnal.akseprin.org/index.php/MJAI/article/view/172 (Accessed: 28 October 2026).